DONGGUAN XINGDONG ELECTRONICS CO., LTD.
Add: NO.2, Dagao Hengfeng 2nd Road, Changping Town, Dongguan, Guangdong, China
Tel:+86-769-83660708
Fax:+86-769-83660718
Email:info@d-fan.com.cn
URL:http://www.ywgzs.cn/eng/
The operator must be familiar with before starting on the present regulations, operating procedures in strict accordance with the "Blower Fan".
1, check the fuel tank lubricating oil level, the dipstick should be in between the lower limit.
2, notice substation to power the unit.
3. Check the machine control cabinet, should be no alarm display, if the police, to identify the reasons for the elimination
4, select the "manual" state. (With a finger touch "Manual" key).
5.Check the pressure relief valve is in the open position (relief valve green light lit). Check the diffuser should be placed a minimum opening degree (minimum green light diffuser).