DONGGUAN XINGDONG ELECTRONICS CO., LTD.
Add: NO.2, Dagao Hengfeng 2nd Road, Changping Town, Dongguan, Guangdong, China
Tel:+86-769-83660708
Fax:+86-769-83660718
Email:info@d-fan.com.cn
URL:http://www.ywgzs.cn/eng/
Check again before installation fans all parts are in good condition, otherwise it should be repaired; 1. Read "Micro Cooling Fan" operating instructions and product samples, knowledge and understanding of the fan size, form, orientation and air flow in and out of the impeller rotation direction .
2. The fan must have safety devices to prevent accidents during installation by professionals familiar with the relevant safety requirements of the installation and wiring.
3. To join the fan duct with a separate import and export support, not allowed to add the weight of the pipe overlapping parts on the blower; wind turbine installation should pay attention to the horizontal position of the fan, the fan and the foundation coupled combination of surface and out of the wind pipe should adjust it so natural fit, not be forced to join.
4. "Micro Cooling Fan" After installation, hand or lever toggle wheel, check if there are too tight or collision, the availability interfere with the rotation of items, with no anomalies, commissioning can be carried out, the fan drive device the exposed part should guard (user) as the fan inlet is not connected to the pipeline, but also need to purchase fencing or other mounting device (user-supplied).
5. Fan the distribution control box must match the corresponding fan (of power, voltage, pneumatic control forms, etc.).
6. The fan wiring by a qualified electrician wiring, wiring must be correct and reliable, especially numbered wiring consistent numbering fan electrical control box at the terminal on the fan housing should be reliable grounding must be reliable, not a substitute for ground zero connection .
7. "Micro Cooling Fan" installation should be checked after all internal fans have a legacy tool box debris.
Previous: Micro Cooling Fan works